Difference between revisions of "Forebays: Gallery"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m
m
Line 1: Line 1:
<Gallery mode="packed">
+
<gallery mode="packed" widths=200px heights=200px>  
 +
Solid splashpad.jpg|Solid splash pad preventing erosion from the flow from the [[inlet]]. Image credit [https://www.flickr.com/photos/dylanpassmore/ Dylan Passmore]
 
Forebay AV.jpg|[[Forebay]] connected to drainage area in the roadway with a [[curb cut]], [[overflow]] visible in the centre of forebay area, level spreading is encouraged with the rock [[check dams]], Milwaukee, WI,[[Acknowledgements| Photo credit: Aaron Volkening]]
 
Forebay AV.jpg|[[Forebay]] connected to drainage area in the roadway with a [[curb cut]], [[overflow]] visible in the centre of forebay area, level spreading is encouraged with the rock [[check dams]], Milwaukee, WI,[[Acknowledgements| Photo credit: Aaron Volkening]]
 
</gallery>
 
</gallery>
 
[[Category:Gallery]]
 
[[Category:Gallery]]

Revision as of 14:40, 17 March 2018