Difference between revisions of "Rainwater harvesting: Sizing and modeling"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) (→Rapid) |
Jenny Hill (talk | contribs) |
||
Line 1: | Line 1: | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | [[file:Cistern_Size.png | | + | [[file:Cistern_Size.png | 200 px | Frame |Caption]] |
<h4>Rapid</h4> | <h4>Rapid</h4> | ||
Cistern size can be estimated by multiplying the depth | Cistern size can be estimated by multiplying the depth |
Revision as of 19:23, 2 June 2017
Rapid
Cistern size can be estimated by multiplying the depth
Interactive Sizing Tool[edit]
The Sustainable Technologies Evaluation Program have produced a rainwater harvesting design and costing tool specific to Ontario. The tool is in a simple to use Excel format and is free to download.
<panelInfo> RWH Sizing Tool </panelInfo>
The Treatment Train Tool[edit]
Once the size of cistern has been determined, it can easily be modelled in many open source and proprietary applications.
In addition to the cistern size, modelling requires <btnPrimary>The Treatment Train Tool</btnPrimary>