Difference between revisions of "Groundwater"
Jenny Hill (talk | contribs) (Created page with "<poem> Where possible, it is recommended that infiltration BMPs maintain a 1.0 m vertical separation above the seasonally high groundwater table. Retention of this unsat...") |
Jenny Hill (talk | contribs) m |
||
Line 6: | Line 6: | ||
*Minimizes the potential for localized groundwater mounding to affect nearby buildings or infrastructure, and/or | *Minimizes the potential for localized groundwater mounding to affect nearby buildings or infrastructure, and/or | ||
*Provides a factor-of-safety against potential uncertainties related to the elevation of the seasonally high groundwater elevation in areas of limited monitoring. | *Provides a factor-of-safety against potential uncertainties related to the elevation of the seasonally high groundwater elevation in areas of limited monitoring. | ||
− | The requirement for additional investigation and/or documentation supporting a proposed design may be reduced in areas where 1.0 m separation | + | The requirement for additional investigation and/or documentation supporting a proposed design may be reduced in areas where ≥ 1.0 m separation is anticipated. |
In areas where a 1.0 m separation cannot be provided, or where conditions dictate that an even greater separation may be warranted, additional discussion and/or analysis specific to the physical characteristics of the site and the proposed design should be completed. | In areas where a 1.0 m separation cannot be provided, or where conditions dictate that an even greater separation may be warranted, additional discussion and/or analysis specific to the physical characteristics of the site and the proposed design should be completed. | ||
The design practitioner is advised to consult with approval agencies to understand their requirements and/or expectations prior to undertaking work, and to complete an appropriate level of analysis to support their conclusion. | The design practitioner is advised to consult with approval agencies to understand their requirements and/or expectations prior to undertaking work, and to complete an appropriate level of analysis to support their conclusion. | ||
</poem> | </poem> |
Revision as of 20:53, 22 November 2017
Where possible, it is recommended that infiltration BMPs maintain a 1.0 m vertical separation above the seasonally high groundwater table.
Retention of this unsaturated zone:
- Minimizes the potential for functional impacts associated with reduced percolation rates,
- Maintains the physical and biochemical water quality treatment benefits provided within the vadose zone,
- Minimizes the potential for localized groundwater mounding to affect nearby buildings or infrastructure, and/or
- Provides a factor-of-safety against potential uncertainties related to the elevation of the seasonally high groundwater elevation in areas of limited monitoring.
The requirement for additional investigation and/or documentation supporting a proposed design may be reduced in areas where ≥ 1.0 m separation is anticipated.
In areas where a 1.0 m separation cannot be provided, or where conditions dictate that an even greater separation may be warranted, additional discussion and/or analysis specific to the physical characteristics of the site and the proposed design should be completed.
The design practitioner is advised to consult with approval agencies to understand their requirements and/or expectations prior to undertaking work, and to complete an appropriate level of analysis to support their conclusion.