Difference between revisions of "Notation"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 1: Line 1:
 +
;L
 +
:Length, e.g. of a reach, channel or swale (usually in m)
 +
 
;m
 
;m
 
:run of side slopes in channel cross sections (length, but usually expressed as a ratio in relation to rise. e.g. where side side slopes = 1:3.5, m = 3.5)
 
:run of side slopes in channel cross sections (length, but usually expressed as a ratio in relation to rise. e.g. where side side slopes = 1:3.5, m = 3.5)
Line 13: Line 16:
 
;SCF
 
;SCF
 
:Safety correction factor (dimensionless)
 
:Safety correction factor (dimensionless)
 +
 +
;y
 +
:Depth of water (length, usually m or sometimes mm)

Revision as of 19:10, 27 September 2017

L
Length, e.g. of a reach, channel or swale (usually in m)
m
run of side slopes in channel cross sections (length, but usually expressed as a ratio in relation to rise. e.g. where side side slopes = 1:3.5, m = 3.5)
q
infiltration rate in (length per time, usually mm/hr) (before or after application of safety factor?)
Ra
Existing rise of swale gradient (length, usually m)
Rb
Rise of compensation gradient for an enhanced swale (length, usually m)
SCF
Safety correction factor (dimensionless)
y
Depth of water (length, usually m or sometimes mm)