Difference between revisions of "Absorbent landscapes"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 1: Line 1:
 
Get excited! This page is going to contain content prepared by [[User:Dean_Young| Dean Young]]!
 
Get excited! This page is going to contain content prepared by [[User:Dean_Young| Dean Young]]!
  
''Soil amendment guidelines (from 2010 guide section 3 - placed here by Jen)  
+
{{textbox|=''Soil amendment guidelines (from 2010 guide section 3 - placed here by Jen)  
 
Soil amendment sizing criteria:
 
Soil amendment sizing criteria:
 
impervious area / soil area = 1
 
impervious area / soil area = 1
Line 10: Line 10:
 
*use 300 mm compost, till to 450 - 600 mm depth
 
*use 300 mm compost, till to 450 - 600 mm depth
 
Compost should consist of well-aged (at least one year) leaf compost. Amended soil should have an organic content of 8-15% by weight or 30-40% by volume.
 
Compost should consist of well-aged (at least one year) leaf compost. Amended soil should have an organic content of 8-15% by weight or 30-40% by volume.
Source: Soils for Salmon, 2005''
+
Source: Soils for Salmon, 2005''}}
  
  

Revision as of 17:48, 12 September 2017

Get excited! This page is going to contain content prepared by Dean Young!


In the meantime, here's a few materials links that may prove useful

See also

Downspout disconnection vegetated filter strips