Five percent of the average annual yield can be estimated
Five percent of the average annual yield can be estimated
−
$$Y_{0.05} = A \times C_{vol, A}\times R_{a} \times e \times 0.05$$
+
$$Y_{0.05} = A \times C_{vol,A}\times R_{a} \times e \times 0.05$$
where:
where:
{{plainlist|
{{plainlist|
Line 27:
Line 27:
#The average annual demand (D) is greater than the average annual yield (Y) from the catchment.
#The average annual demand (D) is greater than the average annual yield (Y) from the catchment.
−
{{textbox|{{plainlist|
+
*When :<math>0.33<Y_{0.05}/D_{0.05}<0.7</math>, the storage volume required can be estimated:
−
*When Y<sub>0.05</sub>/ D<sub>0.05</sub> < 0.33, the storage volume required can be estimated:
+
<math>V_{S} = A \times C_{vol,E}\times R_{d} \times e</math>
−
*<strong>V<sub>S</sub> = A × C<sub>vol</sub> × R<sub>d</sub> × e</strong>
+
Where:
−
*V<sub>S</sub> = Storage volume required (L)
+
{{plainlist|
−
*A = The catchment area (m<sup>2</sup>)
+
*''V<sub>S</sub>'' = Storage volume required (L)
−
*C<sub>vol, E</sub> = The design storm runoff coefficient for the catchment
+
*''A'' = The catchment area (m<sup>2</sup>)
−
*R<sub>d</sub> = The design storm rainfall depth (mm), and
+
*''C<sub>vol,E</sub>'' = The design storm runoff coefficient for the catchment
−
*e = The efficiency of the pre-storage filter.}}}}
+
*''R<sub>d</sub>'' = The design storm rainfall depth (mm), and
+
*''e'' = The efficiency of the pre-storage filter.}}