Difference between revisions of "Infiltration chambers: Specifications"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 1: Line 1:
*Chambers should be certified to [http://shop.csa.ca/en/canada/plumbing-products-and-materials/b184-series-11-r2015/invt/27032382011 CSA B184 SERIES-11 (R2015)] "Polymeric subsurface stormwater management structures".
+
<h5>Plastic chambers</h5>
*Chambers must meet the requirements of [https://www.astm.org/Standards/F2418.htm ASTM F2418-16a] “Standard Specification for Polypropylene (PP) Corrugated Wall Stormwater Collection Chambers”.  
+
Chambers should be compliant with:
*Allowable loads for the chambers must be determined in accordance with [https://www.astm.org/Standards/F2787.htm ASTM F2787-13] “Standard Practice for Structural Design of Thermoplastic Corrugated Wall Stormwater Collection Chambers”.
+
*[http://shop.csa.ca/en/canada/plumbing-products-and-materials/b184-series-11-r2015/invt/27032382011 CSA B184 SERIES-11 (R2015)] "Polymeric subsurface stormwater management structures".
 +
*[https://www.astm.org/Standards/F2418.htm ASTM F2418-16a] “Standard Specification for Polypropylene (PP) Corrugated Wall Stormwater Collection Chambers”.  
 +
Allowable loads for the chambers must be determined in accordance with [https://www.astm.org/Standards/F2787.htm ASTM F2787-13] “Standard Practice for Structural Design of Thermoplastic Corrugated Wall Stormwater Collection Chambers”.
 +
<h5>Concrete chambers</h5>
 +
Chambers should be compliant with:
 +
*[http://shop.csa.ca/en/canada/structures/a233-14/invt/27005072014 CSA A23.3-14] "Design of concrete structures",
 +
*[http://shop.csa.ca/en/canada/concrete/a231-09a232-09-r2014/invt/27012102009 CSA A23.1-09/A23.2-09 (R2014)] "Concrete materials and methods of concrete construction/Test methods and standard practices for concrete", and
 +
*[https://www.astm.org/Standards/C858.htm ASTM C858 - 10e1] "Standard Specification for Underground Precast Concrete Utility Structures".

Revision as of 19:19, 8 August 2017

Plastic chambers

Chambers should be compliant with:

Allowable loads for the chambers must be determined in accordance with ASTM F2787-13 “Standard Practice for Structural Design of Thermoplastic Corrugated Wall Stormwater Collection Chambers”.

Concrete chambers

Chambers should be compliant with: