Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events. Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary [[Erosion control blankets|ECB]]).
+
<p>Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events. Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary [[Erosion control blankets| erosion control blanket]]).
−
*Mats should be applied with soil fill technique:
+
Mats should be applied with soil fill technique:
−
**Grade the swale and smooth the top soil, removing any debris and large rocks,
+
<ol>
−
**Seed with turf grass mixture,
+
<li>Grade the swale and smooth the top soil, removing any debris and large rocks,</li>
−
**Dig 150 mm anchor trench at the top of the channel,
+
<li>Seed with turf grass mixture,</li>
−
**Secure blanket into the trench with staples every 300 mm. Backfill and compact soil into the trench,
+
<li>Dig 150 mm anchor trench at the top of the channel,</li>
−
**Unroll mat in the direction of flow. Staple as recommended by manufacturer,
+
<li>Secure blanket into the trench with staples every 300 mm. Backfill and compact soil into the trench,</li>
−
**Overlaps should be 150 mm and stapled. Upstream mat should always overlay the downstream mat,
+
<li>Unroll mat in the direction of flow. Staple as recommended by manufacturer,</li>
−
**Anchor the bottom end of the channel in a similar fashion to the top,
+
<li>Overlaps should be 150 mm and stapled. Upstream mat should always overlay the downstream mat, </li>
−
**Apply 15-20 mm of topsoil over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil,
+
<li>Anchor the bottom end of the channel in a similar fashion to the top, </li>
−
**An [[Erosion control blankets|ECB]] may be applied to protect the surface through the first one or two years,
+
<li>Apply 15-20 mm of [[topsoil]] over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil, </li>
−
**Irrigate until turf grass is established.
+
<li>An [[Erosion control blankets| erosion control blanket]] may be applied to protect the surface through the first one or two years, </li>
−
+
<li>Irrigate until turf grass is established. </li>
+