Changes

Jump to navigation Jump to search
Line 252: Line 252:     
'''Stormwater Management Strategy'''
 
'''Stormwater Management Strategy'''
#Use a combination of increased topsoil depths, perforated storm sewers, stormwater management facility, and an infiltration facility to provide quality, quantity, and reduce runoff volumes to match pre-development.
+
#Use a combination of increased topsoil depths, perforated storm sewers, stormwater management facility, and an [[infiltration]] facility to provide [[water quality|quality]], quantity, and reduce runoff volumes to match pre-development.
 
#Even with favorable soils and maximum use of infiltration techniques, site still requires quantity control storage for large storm events.
 
#Even with favorable soils and maximum use of infiltration techniques, site still requires quantity control storage for large storm events.
      
===Example 5: 3775-4005 Dundas St West (includes 2-6 Humber Hill Ave), Toronto===
 
===Example 5: 3775-4005 Dundas St West (includes 2-6 Humber Hill Ave), Toronto===

Navigation menu