Changes

Jump to navigation Jump to search
1,630 bytes added ,  4 months ago
no edit summary
Line 205: Line 205:     
Central Lake Ontario Conservation Authority have been undertaking a coastal wetland monitoring project across Durham region, see [https://www.cloca.com/lwc/monitoring_coastal.php here].
 
Central Lake Ontario Conservation Authority have been undertaking a coastal wetland monitoring project across Durham region, see [https://www.cloca.com/lwc/monitoring_coastal.php here].
 +
 +
==Inspections and Maintenance==
 +
Constructed wetlands need to be regularly inspected and maintained to ensure that the system is meeting the intended level of treatment.
 +
===Inspections===
 +
Like all LID systems, construction [[Inspections and maintenance:Construction Inspections]] and assumption [[Inspections and maintenance:Assumption Inspections]] inspections should be undertaken during building and handover of constructed wetlands.
 +
 +
Routine operation inspections [[Inspections and maintenance:Routine Operation Inspections]] and preventative maintenance for the lifespan of constructed wetlands should cover:
 +
*Review as-built drawings, maintenance history, and prepare inspection form prior to site visit
 +
*Ease of access for inspections
 +
*Vegetation management - grass mowed to a height greater than 4-6" and clippings collected, invasive species monitoring and control
 +
*Repair of vandalized areas
 +
*Sediment accumulation
 +
*Mechanical equipment check
 +
*Structural component check
 +
 +
A field data sheet for the inspection of constructed wetlands is attached below.
 +
 +
Functional, performance, and environmental effects monitoring (https://wiki.sustainabletechnologies.ca/wiki/Monitoring) can help determine the frequency of routine maintenance and identify the need for more extensive corrective maintenance. Most major corrective maintenance (Inspections and maintenance:Forensic Inspection and Testing (FIT)) for constructed wetlands fall into:
 +
• major structural repair
 +
• bank stabilization
 +
• sediment removal
 +
• unplugging of inlets and outlets
 +
 +
 +
<pdf width="900" height="800">File:SWMFG2016_Guide_April-2018.pdf</pdf>
    
==Gallery==
 
==Gallery==

Navigation menu