Difference between revisions of "Bioretention: Sizing and modeling"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) |
Jenny Hill (talk | contribs) |
||
Line 1: | Line 1: | ||
− | |||
<ol> | <ol> | ||
− | <li> | + | <li>Input data: |
<ul> | <ul> | ||
− | <li>The applicable infiltration coefficient (q) is calculated by applying the safety factor to the [[Infiltration: Testing|measured infiltration rate]].</li> | + | <li>The applicable infiltration coefficient (q) is calculated by applying the [[safety factor]] to the [[Infiltration: Testing|measured infiltration rate]].</li> |
<li>Determine the drainage catchment area (A<sub>D</sub>), and outline the location of the bioretention facility. To begin with, budget for at least 10% of the contributing impervious area to be required for the BMP. </li></li> | <li>Determine the drainage catchment area (A<sub>D</sub>), and outline the location of the bioretention facility. To begin with, budget for at least 10% of the contributing impervious area to be required for the BMP. </li></li> | ||
<li>Unless the biomedia fill material has been tested and certified otherwise, a porosity value (V<sub>r</sub>) of 0.4 may be assumed (i.e. void ratio 40%). </li> | <li>Unless the biomedia fill material has been tested and certified otherwise, a porosity value (V<sub>r</sub>) of 0.4 may be assumed (i.e. void ratio 40%). </li> |
Revision as of 17:48, 10 July 2017
- Input data:
- The applicable infiltration coefficient (q) is calculated by applying the safety factor to the measured infiltration rate.
- Determine the drainage catchment area (AD), and outline the location of the bioretention facility. To begin with, budget for at least 10% of the contributing impervious area to be required for the BMP.
- Unless the biomedia fill material has been tested and certified otherwise, a porosity value (Vr) of 0.4 may be assumed (i.e. void ratio 40%).
- Bioretention facilities are usually between 0.5 m and 1.25 m deep, owing to construction considerations. Determine the maximum available depth (cc max) from the site constraints. The Infiltration page lists these.
- Identify the duration (D) and intensity (i) of design storm(s).
- Calculate the required area