Line 27:
Line 27:
Where the curb alignment along the street is straight, the curb opening may optionally have a bar across the top of the inlet.
Where the curb alignment along the street is straight, the curb opening may optionally have a bar across the top of the inlet.
−
See [[Curb Cuts]] for further details and references to Ontario Provincial Standard Drawings.
+
See [[Curb cuts]] for further details and references to Ontario Provincial Standard Drawings.
<gallery mode="packed" widths=200px heights=200px>
<gallery mode="packed" widths=200px heights=200px>
County Court Blvd biofilter spillway inlet and CB overflow.jpg|OPSD 605.040 Asphalt Spillway inlet to biofilter swale and road catch basin overflow outlet. County Court Blvd., Brampton, ON.
County Court Blvd biofilter spillway inlet and CB overflow.jpg|OPSD 605.040 Asphalt Spillway inlet to biofilter swale and road catch basin overflow outlet. County Court Blvd., Brampton, ON.