Difference between revisions of "Permeable pavements: Gallery"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
<gallery mode="packed" widths=200px heights=200px> | <gallery mode="packed" widths=200px heights=200px> | ||
− | + | Pervious asphalt.jpg|Porous asphalt, Coultice Park, Whitchurch-Stoufville, ON | |
Concrete grid paving.jpg|Laneways retrofit program, Toronto ON | Concrete grid paving.jpg|Laneways retrofit program, Toronto ON | ||
Lakeside - permeable concrete 1.JPG| Permeable concrete at Lakeside Park, Mississauga ON | Lakeside - permeable concrete 1.JPG| Permeable concrete at Lakeside Park, Mississauga ON |
Revision as of 18:28, 13 August 2020
Permeable pavers in parking bays, Mississauga ON (note inspection of bioretention occurring in the background)
Inspection wells should be located at the edges or even off the side of permeable pavement areas