Changes

Jump to navigation Jump to search
Line 33: Line 33:  
==Infiltration Trenches/Chambers & Soakaways==
 
==Infiltration Trenches/Chambers & Soakaways==
   −
Please see below a profile and plan view of an infiltration trench designed to treat and temporarily store stormwater for use in the City of Toronto located within the laneway between the road and sidewalk in a heavily urbanized location. This drawing depicts partial exfiltration where remaining stormwater runoff is directed to the nearby storm sewer system.  
+
Please see below a profile and plan view of an infiltration trench designed to treat and temporarily store stormwater for use in the City of Toronto located within the laneway between the road and sidewalk in a heavily urbanized location. This drawing depicts the use of an underdrain in the system where remaining stormwater runoff is directed to the nearby storm sewer system.  
    
Drawings are from the City of Toronto's, [https://www.toronto.ca/services-payments/building-construction/infrastructure-city-construction/construction-standards-permits/standards-for-designing-and-constructing-city-infrastructure/construction-specifications-drawings-for-green-infrastructure/?accordion=green-infrastructure-drawings Design Criteria for Green Infrastructure in the Right-of-Way] <ref>https://www.toronto.ca/services-payments/building-construction/infrastructure-city-construction/construction-standards-permits/standards-for-designing-and-constructing-city-infrastructure/construction-specifications-drawings-for-green-infrastructure/?accordion=green-infrastructure-drawings Design Criteria for Green Infrastructure in the Right-of-Way </ref> document. For further details about these cross section drawings please visit the link.
 
Drawings are from the City of Toronto's, [https://www.toronto.ca/services-payments/building-construction/infrastructure-city-construction/construction-standards-permits/standards-for-designing-and-constructing-city-infrastructure/construction-specifications-drawings-for-green-infrastructure/?accordion=green-infrastructure-drawings Design Criteria for Green Infrastructure in the Right-of-Way] <ref>https://www.toronto.ca/services-payments/building-construction/infrastructure-city-construction/construction-standards-permits/standards-for-designing-and-constructing-city-infrastructure/construction-specifications-drawings-for-green-infrastructure/?accordion=green-infrastructure-drawings Design Criteria for Green Infrastructure in the Right-of-Way </ref> document. For further details about these cross section drawings please visit the link.

Navigation menu