Changes

Jump to navigation Jump to search
Line 125: Line 125:  
*D = Design storm duration (h)}}<br>
 
*D = Design storm duration (h)}}<br>
 
* Step 6: Compare required surface area of the practice to available space.<br>
 
* Step 6: Compare required surface area of the practice to available space.<br>
To decrease A<sub>p</sub>, consider increasing ponding depth if feasible and would not create a safety hazard (recommended maximum of 0.45 m), or decreasing the catchment area.
+
To decrease A<sub>p</sub>, consider increasing ponding depth if feasible and would not create a safety hazard (recommended maximum of 0.45 m), increasing storage reservoir depth to create inactive water storage that increases hydraulic head and infiltration rate at the base of the practice, or decreasing the catchment area.
 
* Step 7:  Calculate catchment impervious area to practice permeable (footprint) area ratio, R, also referred to as I/P ratio:
 
* Step 7:  Calculate catchment impervious area to practice permeable (footprint) area ratio, R, also referred to as I/P ratio:
 
<math>R=A_{i}/A_{p}</math><br>
 
<math>R=A_{i}/A_{p}</math><br>

Navigation menu