!Wellhead Protection Area<ref>|Time-of-travel within wellhead protection areas</ref> | !Wellhead Protection Area<ref>|Time-of-travel within wellhead protection areas</ref> | ||
|- | |- | ||
− | + | |Rain Barrel | |
− | + | |Not applicable | |
− | + | ||[5 to 50 m<sup>2</sup>]||Not applicable||1||0||NA||Yes||None||None||None | |
|- | |- | ||
− | + | |Cistern | |
− | + | |Not applicable | |
− | + | |1:1||Not applicable||0||0||0||Yes||None||None||None | |
|- | |- | ||
− | + | |Roof Downspout Disconnection | |
− | + | |Not applicable | |
− | + | |[5 to 100 m<sup>2</sup>]||Amend if < 15 mm/hr||0.5||5 to 20||1 to 5||Yes||Building Foundation||None||None | |
|- | |- | ||
− | + | |style="background: #FFFDF5; color: black"|Soakaway, Infiltration Trench or Chamber | |
− | + | |1 | |
− | + | |5:1 to 20:1||Not a constraint||1 to 2||0 to 1||<15 %||No||4m- Building Foundation<br>Underground Utilities, Trees,<br>Drinking Water Wellhead<br>Protection Areas||1 m||2 yr | |
|- | |- | ||
− | + | |Bioretention | |
− | + | |1 | |
− | + | |5:1 to 15:1||Underdrain required<br>if < 15 mm/hr||1 to 2||5 to 10||0 to 2||No||4m- Building Foundation<br>Underground Utilities, Trees,<br>Drinking Water Wellhead<br>Protection Areas||1 m||2 yr | |
|- | |- | ||
!style="background: #FFFDF5; color: black"|Biofilter (Filtration only Bioretention Design) | !style="background: #FFFDF5; color: black"|Biofilter (Filtration only Bioretention Design) | ||
Line 40: | Line 40: | ||
!|5:1||Not applicable||1 to 2||2 to 5||0 to 2||Yes||Building Foundation, Trees||None||None | !|5:1||Not applicable||1 to 2||2 to 5||0 to 2||Yes||Building Foundation, Trees||None||None | ||
|- | |- | ||
− | + | |Vegetated Filter Strip | |
− | + | |1 | |
− | + | |5:1||Amend if < 15 mm/hr||0 to 1||15 to 20||1 to 5||No||None||None||None | |
|- | |- | ||
− | + | |Permeable Pavement | |
− | + | |1 | |
− | + | |1:1 to 1.2:1||Underdrain Required <br> if < 15 mm/hr||0.5 to 1||0||1 to 5||No||4m-Underground Utilities<br>Drinking Water Wellhead<br>Protection Areas||1 m||2 Yr | |
|- | |- | ||
− | + | |Enhanced Grass Swale | |
!1 | !1 | ||
!|5:1 to 10:1||Not applicable||1 to 3||5 to 15||0.5 to 6||No||4m- Building Foundation<br>Underground Utilities||1 m||None | !|5:1 to 10:1||Not applicable||1 to 3||5 to 15||0.5 to 6||No||4m- Building Foundation<br>Underground Utilities||1 m||None |
Revision as of 15:16, 31 January 2019
LID Stormwater Management Practice | Depth to High Water or Bedrock (m)[1] | Typical Ratio of Impervious Drainage Area to Treatment Facility Area |
Native Soil Infiltration Rate (mm/hr)[2] | Head (m)[3] | Space % [4] | Slope % [5] | Applicable in Pollution Hotspots [6] | Set Backs | Water Table [7] | Wellhead Protection Area[8] |
---|---|---|---|---|---|---|---|---|---|---|
Rain Barrel | Not applicable | [5 to 50 m2] | Not applicable | 1 | 0 | NA | Yes | None | None | None |
Cistern | Not applicable | 1:1 | Not applicable | 0 | 0 | 0 | Yes | None | None | None |
Roof Downspout Disconnection | Not applicable | [5 to 100 m2] | Amend if < 15 mm/hr | 0.5 | 5 to 20 | 1 to 5 | Yes | Building Foundation | None | None |
Soakaway, Infiltration Trench or Chamber | 1 | 5:1 to 20:1 | Not a constraint | 1 to 2 | 0 to 1 | <15 % | No | 4m- Building Foundation Underground Utilities, Trees, Drinking Water Wellhead Protection Areas |
1 m | 2 yr |
Bioretention | 1 | 5:1 to 15:1 | Underdrain required if < 15 mm/hr |
1 to 2 | 5 to 10 | 0 to 2 | No | 4m- Building Foundation Underground Utilities, Trees, Drinking Water Wellhead Protection Areas |
1 m | 2 yr |
Biofilter (Filtration only Bioretention Design) | Not applicable | 5:1 | Not applicable | 1 to 2 | 2 to 5 | 0 to 2 | Yes | Building Foundation, Trees | None | None |
Vegetated Filter Strip | 1 | 5:1 | Amend if < 15 mm/hr | 0 to 1 | 15 to 20 | 1 to 5 | No | None | None | None |
Permeable Pavement | 1 | 1:1 to 1.2:1 | Underdrain Required if < 15 mm/hr |
0.5 to 1 | 0 | 1 to 5 | No | 4m-Underground Utilities Drinking Water Wellhead Protection Areas |
1 m | 2 Yr |
Enhanced Grass Swale | 1 | 5:1 to 10:1 | Not applicable | 1 to 3 | 5 to 15 | 0.5 to 6 | No | 4m- Building Foundation Underground Utilities |
1 m | None |
Dry Swale (Bioswale) | 1 | 5:1 to 15:1 | Underdrain Required if < 15 mm/hr |
1 to 3 | 5 to 10 | 0.5 to 6 | No | 4m (3m if impermeable liner is used)Building foundation, Underground utilities, drinking water wellhead protection areas |
1 m | 2 Yr |
Perforated Pipe System | 1 | 5:1 to 10:1 | Not a constraint | 1 to 3 | 0 | < 15% | No | 4m- Building Foundation Underground Utilities, Trees, Drinking Water Wellhead Protection Areas |
1 m | 2 Yr |
- ↑ Minimum depth between the base of the facility and the elevation of the seasonally high water table or top of bedrock
- ↑ Infiltration rate estimates based on measurements of hydraulic conductivity under field saturated conditions at the proposed location and depth of the practice
- ↑ Vertical distance between the inlet and outlet of the LID practice
- ↑ Percent of open pervious land on the site that is required for the LID practice
- ↑ Slope at the LID practice location
- ↑ Suitable in pollution hot spots or runoff source areas where land uses or activities have the potential to generate highly contaminated runoff
- ↑ Separated from the seasonally high water table or top of bedrock elevation
- ↑ |Time-of-travel within wellhead protection areas