Difference between revisions of "Rainwater harvesting: Sizing and modeling"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 20: Line 20:
 
<div class="col-md-4">
 
<div class="col-md-4">
 
<panelInfo>
 
<panelInfo>
[http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/rainwater-harvesting/rainwater-harvesting-design-and-costing-tool/ RWH Sizing Tool]
+
[File:Connect the Drops.PNG|http://www.sustainabletechnologies.ca/wp/home/urban-runoff-green-infrastructure/low-impact-development/rainwater-harvesting/rainwater-harvesting-design-and-costing-tool/]
 
</panelInfo>
 
</panelInfo>
 
</div>
 
</div>
 
<div class="col-md-12">
 
<div class="col-md-12">
 
----
 
----
 +
 
===The Treatment Train Tool===
 
===The Treatment Train Tool===
 
</div>
 
</div>

Revision as of 20:29, 5 June 2017

Rapid[edit]

Total cistern volume can be estimated by multiplying the depth of design storm....

<panelInfo>

</panelInfo>


STEP RWH tool[edit]

The Sustainable Technologies Evaluation Program have produced a rainwater harvesting design and costing tool specific to Ontario. The tool is in a simple to use Excel format and is free to download.


The Treatment Train Tool[edit]

Once the size of cistern has been determined, it can easily be modelled in many open source and proprietary applications.

In addition to the cistern size, modelling requires

<btnPrimary>The Treatment Train Tool</btnPrimary>