Difference between revisions of "Check dams"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) |
Jenny Hill (talk | contribs) |
||
Line 4: | Line 4: | ||
*Check dams usually consist of crushed rock gabions, or pre-treated timber up to 0.6 m in height. | *Check dams usually consist of crushed rock gabions, or pre-treated timber up to 0.6 m in height. | ||
*Rocks used in check dams should have median diameter 25-75 mm. | *Rocks used in check dams should have median diameter 25-75 mm. | ||
− | *The spacing of dams should not exceed the horizontal distance from the toe of the upstream dam to the same elevation on the downstream dam. | + | *The spacing of dams should not exceed the horizontal distance from the toe of the upstream dam to the same elevation on the downstream dam. See: Sizing |
*Where check dams are used, the maximum design depth of ponded water must be 0.5 m.}} | *Where check dams are used, the maximum design depth of ponded water must be 0.5 m.}} | ||
+ | ==Sizing== | ||
{{:Check dams: Sizing}} | {{:Check dams: Sizing}} |
Revision as of 19:13, 21 September 2017
Check dams are small dams or weirs constructed across a drainage ditch, swale, or channel to lower the speed of concentrated flows for a certain design range of storm events and to promote infiltration.
- Check dams usually consist of crushed rock gabions, or pre-treated timber up to 0.6 m in height.
- Rocks used in check dams should have median diameter 25-75 mm.
- The spacing of dams should not exceed the horizontal distance from the toe of the upstream dam to the same elevation on the downstream dam. See: Sizing
- Where check dams are used, the maximum design depth of ponded water must be 0.5 m.