Difference between revisions of "Bioretention: Sizing and modeling"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 35: Line 35:
 
<math>d=\frac{D\left (\left [ I/P \right ]i-q \right )}{n}</math>
 
<math>d=\frac{D\left (\left [ I/P \right ]i-q \right )}{n}</math>
  
 +
To calculate the require facility area or footprint where the depth is constrained:
 +
<math>P=\frac{IiD}{nd+qD}</math>
  
 +
<strong>[[Media:Infiltration Sizing.xlsx|Download .xlsx calculation tool]]</strong>
  
*The applicable infiltration coefficient (''q'') is calculated by applying a [[Infiltration: Testing|safety factor to the measured infiltration rate]].
 
*Determine the impervious catchment area (''I''), and outline the location of the bioretention facility. To begin with, budget for at least 10% of the total catchment area to be required for the BMP. The area of the facility on the ground will be 'P' (pervious).
 
*Unless the biomedia fill material has been tested and certified otherwise, a porosity value (''n'') of 0.35 may be assumed (i.e. void ratio 35%).
 
*Bioretention facilities are usually between 0.5 m and 1.25 m deep, owing to construction considerations. Determine the maximum available depth of the facility (''d<sub>f max</sub>'') from the site constraints. The [[Infiltration]] page lists these.
 
Identify the duration (''D'') and intensity (''i'') of design storm(s).
 
Calculate the required facility area (''P'').
 
 
<math>d_{f}=\frac{D\left (\left [ I/P \right ]i-q \right )}{n}</math>
 
 
<math>\left [ I/P \right ]= \frac{Cn+qD}{in}</math>
 
 
<strong>[[Media:Infiltration Sizing.xlsx|Download .xlsx calculation tool]]</strong>
 
 
[[category: modeling]]
 
[[category: modeling]]
 
[[category: infiltration]]
 
[[category: infiltration]]

Revision as of 20:09, 18 August 2017

Before beginning the sizing calculations most of the following parameters must be known or estimated. The exceptions are the depth (d) and Permeable area (P), as only one of these is required to find the other. Note that some of these parameters are limited:

  • The maximum total depth will be limited by construction practices i.e. not usually > 2 m.
  • The maximum total depth may be limited by the conditions underground e.g. the groundwater or underlying geology/infrastructure.
  • The minimum total depth may be limited by the need to support vegetation i.e. not < 0.6 m.


Inputs
Symbol Units Parameter
D hrs Duration of design storm (for MOECC volume based caclulations set to 1)
i mm/hr Intensity of design storm (for MOECC volume based calculations use whole storm depth (link to map))
q mm/hr Infiltration coefficient, calculated from measured infiltration rate and applied safety factor
n - Porosity, as measured (or default to 0.35)
I m2 Impermeable area i.e. catchment
d m depth of Infiltration facility or BMP
P m2 Permeable area i.e. area of the facility or BMP

To calculate the required depth, where the area of the facility is constrained:

To calculate the require facility area or footprint where the depth is constrained:

Download .xlsx calculation tool