Changes

Jump to navigation Jump to search
Line 34: Line 34:  
<br />• post-development without SWM facilities (red) discharge responds quickly to rainfall and has high peak flow
 
<br />• post-development without SWM facilities (red) discharge responds quickly to rainfall and has high peak flow
 
<br />• post-development with an end-of-pipe SWM pond (green) discharge reaches the same peak flow as pre-development conditions but produces more runoff.
 
<br />• post-development with an end-of-pipe SWM pond (green) discharge reaches the same peak flow as pre-development conditions but produces more runoff.
 +
 
The checkered yellow space between the blue and green lines shows the difference between the runoff volumes - this area is where LID can be used to reduce runoff by storing and infiltrating rainfall. Image credit: Daniel Filippi.]]}}
 
The checkered yellow space between the blue and green lines shows the difference between the runoff volumes - this area is where LID can be used to reduce runoff by storing and infiltrating rainfall. Image credit: Daniel Filippi.]]}}
  

Navigation menu