| Line 55: |
Line 55: |
| | |Drainage Area | | |Drainage Area |
| | |Minimum orifice size (see [[flow control]]) | | |Minimum orifice size (see [[flow control]]) |
| − | |style="text-align: left|5 Ha (≥10 Ha preferred) | + | |style="text-align: left| |
| | + | *5 Ha |
| | + | *≥10 Ha preferred |
| | |- | | |- |
| | |Treatment Volume | | |Treatment Volume |
| | |Provision of appropriate level of protection | | |Provision of appropriate level of protection |
| − | |style="text-align: left|See [[Dry ponds#Volume|below]] | + | |style="text-align: left| |
| | + | *See [[Dry ponds#Volume|below]] |
| | |- | | |- |
| | |[[Dry ponds#Detention time|Active Storage]] | | |[[Dry ponds#Detention time|Active Storage]] |
| | |Detention | | |Detention |
| − | |style="text-align: left|[[Sedimentation|Suspended solids]] settling 24 hrs (48 hrs preferred) | + | |style="text-align: left| |
| | + | *[[Sedimentation|Suspended solids]] settling 24 hrs |
| | + | *48 hrs preferred for water quality benefits |
| | |- | | |- |
| | |Forebay | | |Forebay |
| Line 74: |
Line 79: |
| | |Maximize flow path and minimize short-circuiting potential | | |Maximize flow path and minimize short-circuiting potential |
| | |style="text-align: left| | | |style="text-align: left| |
| − | *Overall: minimum 3:1; | + | *Overall: minimum 3:1 |
| | *4:1 preferred | | *4:1 preferred |
| | |- | | |- |
| | |Depth | | |Depth |
| | |Safety | | |Safety |
| − | |style="text-align: left|Maximum 3 m | + | |style="text-align: left| |
| | + | *Maximum 3 m |
| | + | *Flat bottom to encourage uniform ponding/infiltration (recommended tolerance on base levels 10 mm in 3m) |
| | |- | | |- |
| | |Side slopes (See also [[berms]]) | | |Side slopes (See also [[berms]]) |
| Line 111: |
Line 118: |
| | |Buffer | | |Buffer |
| | |Safety | | |Safety |
| − | |style="text-align: left|Minimum 3 m above maximum water quality/erosion control water level | + | |style="text-align: left| |
| | + | *Minimum 3 m above maximum water quality/erosion control water level |
| | |} | | |} |
| − |
| |
| − | The bottom of a dry pond should be flat to encourage uniform ponding and infiltration across the entire surface. Recommended tolerance on base levels 10 mm in 3m.
| |
| | | | |
| | ===Volume=== | | ===Volume=== |