| Line 32: |
Line 32: |
| | | | |
| | ===table=== | | ===table=== |
| | + | |
| | + | {| class="wikitable" |
| | + | |- |
| | + | ! Practice |
| | + | ! Permanent Pool<br />(m3/Ha) |
| | + | ! Surface Area<br />(m2/Ha) |
| | + | ! Surface Loading Rate<br />L/min/m2 |
| | + | ! Detention Time<br />(hrs) |
| | + | ! Assumptions |
| | + | |- |
| | + | | colspan="6" style="background-color:#96fffb;" | Enhanced Treatment Practices (80% TSS removal) |
| | + | |- |
| | + | | Wet ponds/ Underground Tanks |
| | + | | 250 |
| | + | | 167 |
| | + | | 33 |
| | + | | >24 |
| | + | | Underground tanks sized like ponds, average permanent pool depth =1.5m |
| | + | |- style="border-color:inherit;" |
| | + | | Stormwater Wetland |
| | + | | 140 |
| | + | | 622 |
| | + | | 8.8 |
| | + | | >24 |
| | + | | Average depth =0.225m |
| | + | |- style="border-color:inherit;" |
| | + | | colspan="6" style="background-color:#96fffb;" | Pre-treatment Practices (approx. 30-50% TSS removal) |
| | + | |- |
| | + | | Oil Grit Seperator |
| | + | | 12 |
| | + | | 4.7 |
| | + | | 1177 |
| | + | | Negligible |
| | + | | Varies by manufacturer. 2.44m (8ft) diameter unit with permanent pool depth of 2.6m. 60% removal objective. |
| | + | |- |
| | + | | Catch Basin |
| | + | | 1.6 |
| | + | | 1.8 |
| | + | | 3054 |
| | + | | Negligible |
| | + | | 5 catch basins (0.6 x 0.6m) per Hectare. Permanent pool depth of 0.9m. |
| | + | |} |
| | + | |
| | + | |
| | | | |
| | {| class="wikitable" | | {| class="wikitable" |