Line 3: Line 3:  
==Step-by-Step Compliance Process==
 
==Step-by-Step Compliance Process==
 
===Step 1: Determine if Your Project Falls Under CLI-ECA===
 
===Step 1: Determine if Your Project Falls Under CLI-ECA===
* Identify whether the proposed stormwater or LID project qualifies as a '''pre-authorized alteration''' under CLI-ECA.
+
Identify whether the proposed stormwater or LID project qualifies as a '''pre-authorized alteration''' under CLI-ECA. Common eligible projects include:
Common eligible projects include:
   
* Storm sewer upgrades or extensions
 
* Storm sewer upgrades or extensions
 
* Alterations to stormwater management facilities (e.g., wet ponds, dry ponds, wetlands)
 
* Alterations to stormwater management facilities (e.g., wet ponds, dry ponds, wetlands)
 
* Implementation or modification of LID practices (e.g., bioretention, infiltration trenches, permeable pavements)
 
* Implementation or modification of LID practices (e.g., bioretention, infiltration trenches, permeable pavements)
 
+
===Step 2: Review Design Criteria and Standards===
### **Step 2: Review Design Criteria and Standards**
+
* Ensure project design follows **MECP’s Design Criteria for Sanitary Sewers, Storm Sewers, and Forcemains**.
- Ensure project design follows **MECP’s Design Criteria for Sanitary Sewers, Storm Sewers, and Forcemains**.
+
* Incorporate stormwater treatment objectives from the **Stormwater Management Planning and Design Guidance Manual (2003)**.
- Incorporate stormwater treatment objectives from the **Stormwater Management Planning and Design Guidance Manual (2003)**.
+
* Ensure LID features meet municipal and provincial standards for infiltration, flow control, and water quality treatment.
- Ensure LID features meet municipal and provincial standards for infiltration, flow control, and water quality treatment.
+
===Step 3: Complete Required Documentation===
 
+
Use the appropriate compliance forms based on project type:
### **Step 3: Complete Required Documentation**
  −
- Use the appropriate compliance forms based on project type:
   
   - **Form SW1** – Storm Sewers, Ditches, and Culverts
 
   - **Form SW1** – Storm Sewers, Ditches, and Culverts
 
   - **Form SW2** – Stormwater Management Facilities
 
   - **Form SW2** – Stormwater Management Facilities