Difference between revisions of "Bioretention: Sizing and modeling"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) |
Jenny Hill (talk | contribs) |
||
Line 17: | Line 17: | ||
<clearFix></clearFix> | <clearFix></clearFix> | ||
− | < | + | <btnSuccess [[Media:Infiltration Sizing.xlsx]]>Text</btnSuccess> |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Revision as of 16:52, 10 July 2017
- Gather input data:
- The applicable infiltration coefficient (q) is calculated by applying the safety factor to the measured infiltration rate.
- Determine the drainage catchment area (AD), and outline the location of the bioretention facility. To begin with, budget for at least 10% of the contributing impervious area to be required for the BMP.
- Unless the biomedia fill material has been tested and certified otherwise, a porosity value (Vr) of 0.4 may be assumed (i.e. void ratio 40%).
- Bioretention facilities are usually between 0.5 m and 1.25 m deep, owing to construction considerations. Determine the maximum available depth (cc max) from the site constraints. The Infiltration page lists these.
- Identify the duration (D) and intensity (i) of design storm(s).
- Calculate the required area
<ThirdLeft> <panelWarning> Download .xlsx calculation tool </panelWarning> </ThirdLeft><TwoThirdRight></TwoThirdRight><clearFix></clearFix> <clearFix></clearFix>
<btnSuccess Media:Infiltration Sizing.xlsx>Text</btnSuccess>