Changes

Jump to navigation Jump to search
m
Line 53: Line 53:  
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
 
*''f''' = Design infiltration rate (mm/hr), and
 
*''f''' = Design infiltration rate (mm/hr), and
*96 is the desired drainage time (hrs)
+
*96 = [[Drainage time]] (hrs)
*0.4 is the Void ratio of [[reservoir gravel|clear stone]]}}
+
*0.4 = Void ratio of [[reservoir gravel|clear stone]]}}
    
===Additional step for system without underdrain===
 
===Additional step for system without underdrain===
Line 61: Line 61:  
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
 
*''f''' = Design infiltration rate (mm/hr), and
 
*''f''' = Design infiltration rate (mm/hr), and
*48 is the desired drainage time of the ponding (hrs)
+
*48 = Drainage time of the ponding (hrs)
*0.4 is the void ratio of [[reservoir gravel|clear stone]] *Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.}}
+
*0.4 = Void ratio of [[reservoir gravel|clear stone]] *Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.}}
 
* Step 5: Sum total depth of bioretention, and compare to available space above water table and bedrock. Adjust if necessary.
 
* Step 5: Sum total depth of bioretention, and compare to available space above water table and bedrock. Adjust if necessary.
  
8,255

edits

Navigation menu