Changes

Jump to navigation Jump to search
no edit summary
Line 4: Line 4:  
#The ''maximum'' total depth will be limited by construction practices i.e. not usually > 2 m.
 
#The ''maximum'' total depth will be limited by construction practices i.e. not usually > 2 m.
 
#The ''maximum'' total depth may be limited by the [[Infiltration| conditions underground]] e.g. the groundwater or underlying geology/infrastructure.
 
#The ''maximum'' total depth may be limited by the [[Infiltration| conditions underground]] e.g. the groundwater or underlying geology/infrastructure.
#The minimum total depth may be limited by the need to support vegetation i.e. not < 0.6 m.
+
#The minimum total depth will be limited by the need to support vegetation i.e. not < 0.6 m.
#[[Green roofs]], [[absorbent landscapes]] and [[permeable paving]] often receive very little flow from other surfaces, so that the I/P ratio is close to 1.
+
#[[Bioretention cells]] have a maximum recommended I/P ratio of 20.
#[[Infiltration trenches]], [[Infiltration chambers| chambers]] and [[bioretention cells]] have a maximum recommended I/P ratio of 20.
      
==Size a bioretention cell==
 
==Size a bioretention cell==
8,255

edits

Navigation menu