Changes

Jump to navigation Jump to search
no edit summary
Line 19: Line 19:     
native soil types, infiltration capacity and depth to water table must be determined.
 
native soil types, infiltration capacity and depth to water table must be determined.
 +
    
=== Define Design Criteria ===
 
=== Define Design Criteria ===
 +
 
A detailed description of the design criteria that need to be defined is provided in the
 
A detailed description of the design criteria that need to be defined is provided in the
   Line 26: Line 28:     
boundaries, criteria developed should have requirements to:
 
boundaries, criteria developed should have requirements to:
      
* preserve groundwater and baseflow characteristics;
 
* preserve groundwater and baseflow characteristics;
Line 33: Line 34:  
* protect water quality; and ultimately,
 
* protect water quality; and ultimately,
 
* maintain an appropriate diversity of aquatic life and opportunities for human uses
 
* maintain an appropriate diversity of aquatic life and opportunities for human uses
      
The design criteria required to protect, enhance or restore the environmental resources
 
The design criteria required to protect, enhance or restore the environmental resources
Line 44: Line 44:  
* Recharge; and
 
* Recharge; and
 
* Natural Heritage Systems or green infrastructure
 
* Natural Heritage Systems or green infrastructure
 +
    
=== Screen Potential LID Options ===
 
=== Screen Potential LID Options ===
Line 71: Line 72:     
==== Life Cycle Costing Requirements ====
 
==== Life Cycle Costing Requirements ====
 +
    
=== Select LIDs (Conceptual Design) ===
 
=== Select LIDs (Conceptual Design) ===
147

edits

Navigation menu