Line 19: |
Line 19: |
| | | |
| native soil types, infiltration capacity and depth to water table must be determined. | | native soil types, infiltration capacity and depth to water table must be determined. |
| + | |
| | | |
| === Define Design Criteria === | | === Define Design Criteria === |
| + | |
| A detailed description of the design criteria that need to be defined is provided in the | | A detailed description of the design criteria that need to be defined is provided in the |
| | | |
Line 26: |
Line 28: |
| | | |
| boundaries, criteria developed should have requirements to: | | boundaries, criteria developed should have requirements to: |
− |
| |
| | | |
| * preserve groundwater and baseflow characteristics; | | * preserve groundwater and baseflow characteristics; |
Line 33: |
Line 34: |
| * protect water quality; and ultimately, | | * protect water quality; and ultimately, |
| * maintain an appropriate diversity of aquatic life and opportunities for human uses | | * maintain an appropriate diversity of aquatic life and opportunities for human uses |
− |
| |
| | | |
| The design criteria required to protect, enhance or restore the environmental resources | | The design criteria required to protect, enhance or restore the environmental resources |
Line 44: |
Line 44: |
| * Recharge; and | | * Recharge; and |
| * Natural Heritage Systems or green infrastructure | | * Natural Heritage Systems or green infrastructure |
| + | |
| | | |
| === Screen Potential LID Options === | | === Screen Potential LID Options === |
Line 71: |
Line 72: |
| | | |
| ==== Life Cycle Costing Requirements ==== | | ==== Life Cycle Costing Requirements ==== |
| + | |
| | | |
| === Select LIDs (Conceptual Design) === | | === Select LIDs (Conceptual Design) === |