Changes

Jump to navigation Jump to search
no edit summary
Line 5: Line 5:  
     <br> d = Stone reservoir depth (mm)
 
     <br> d = Stone reservoir depth (mm)
 
     <br> q = Infiltration coefficient for native soils (mm/hr) (See [[Infiltration#Planning|Infiltration]] for details on measurement and safety factors)
 
     <br> q = Infiltration coefficient for native soils (mm/hr) (See [[Infiltration#Planning|Infiltration]] for details on measurement and safety factors)
     <br> V<sub>r</sub> = Void space ratio for aggregate(typically 0.4 for 50 mm clear stone)
+
     <br> V<sub>r</sub> = Void space ratio for aggregate (typically 0.35 for clear angular stone)
 
     <br> t<sub>s</sub> = Time to drain (48 hour recommended)
 
     <br> t<sub>s</sub> = Time to drain (48 hour recommended)
 
     <br>
 
     <br>
Line 16: Line 16:  
     </ul>
 
     </ul>
 
</p>
 
</p>
----
+
<p>The ratio of impervious drainage area to infiltration area should be between 5:1 and 20:1 to limit the rate of accumulation of fine sediments and clogging.</p>
The ratio of impervious drainage area to infiltration area should be between 5:1 and 20:1 to limit the rate of accumulation of fine sediments and clogging.</p>
   
[[category: Infiltration]]
 
[[category: Infiltration]]
 
[[category: modeling]]
 
[[category: modeling]]
8,255

edits

Navigation menu