Changes

Jump to navigation Jump to search
Line 212: Line 212:     
Monitoring of storage reservoir water level during and after natural or simulated storm events using the monitoring well should be performed periodically to verify the facility drains within the required drainage time (typically 72 hours).  Should be performed as part of inspections following construction or major rehabilitation prior to assumption, and every 15 years at a minimum, to track drainage performance over time and determine when replacement is needed. <br>
 
Monitoring of storage reservoir water level during and after natural or simulated storm events using the monitoring well should be performed periodically to verify the facility drains within the required drainage time (typically 72 hours).  Should be performed as part of inspections following construction or major rehabilitation prior to assumption, and every 15 years at a minimum, to track drainage performance over time and determine when replacement is needed. <br>
 
+
</br>
 
Take a look at the [[Inspection and Maintenance: Rainwater Harvesting]] page by clicking below for further details about proper inspection and maintenance practices:
 
Take a look at the [[Inspection and Maintenance: Rainwater Harvesting]] page by clicking below for further details about proper inspection and maintenance practices:
  

Navigation menu