Difference between revisions of "Forebays: Gallery"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
m
m
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
 
Solid splashpad.jpg|Solid splash pad preventing erosion from the flow from the [[inlet]]. Image credit [https://www.flickr.com/photos/dylanpassmore/ Dylan Passmore]
 
Solid splashpad.jpg|Solid splash pad preventing erosion from the flow from the [[inlet]]. Image credit [https://www.flickr.com/photos/dylanpassmore/ Dylan Passmore]
 
Forebay AV.jpg|Forebay connected to drainage area in the roadway with a [[curb cut]], [[overflow]] visible in the centre of the feature, level spreading is encouraged with the rock [[check dams]], Milwaukee, WI,[[Acknowledgements| Photo credit: Aaron Volkening]]
 
Forebay AV.jpg|Forebay connected to drainage area in the roadway with a [[curb cut]], [[overflow]] visible in the centre of the feature, level spreading is encouraged with the rock [[check dams]], Milwaukee, WI,[[Acknowledgements| Photo credit: Aaron Volkening]]
Forebay - Mississauga Road.JPG|Rounded 'river rock' and a series of check dams slow water from the [[inlet]], preventing erosion and promoting [[infiltration]].
+
Forebay - Mississauga Road.JPG|Rounded 'river rock' and a series of check dams slow water from this [[inlet]].
 +
Inlet to bioswale - Wychwood.JPG| This forebay has a rock splash pad to slow water down before it reaches a [[bioswale]].
 +
Mississauga Road - Brampton - curb cuts.JPG|Incoming water from these curb cuts is slowed by river rock splash pads.
 
</gallery>
 
</gallery>
 
[[Category:Gallery]]
 
[[Category:Gallery]]

Latest revision as of 18:58, 23 August 2018