Difference between revisions of "Turf reinforcement"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) m |
Jenny Hill (talk | contribs) m |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events. Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary [[Erosion control blankets| erosion control blanket]]). | + | Turf reinforcement mats (TRM) may be required in [[swales]] which are designed to convey higher velocity events. Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary [[Erosion control blankets| erosion control blanket]]). |
Mats should be applied with soil fill technique: | Mats should be applied with soil fill technique: | ||
#Grade the swale and smooth the top soil, removing any debris and large rocks, | #Grade the swale and smooth the top soil, removing any debris and large rocks, | ||
− | #Seed with turf grass mixture, | + | #Seed with [[turf]] grass mixture, |
#Dig 150 mm anchor trench at the top of the channel, | #Dig 150 mm anchor trench at the top of the channel, | ||
#Secure blanket into the trench with staples every 300 mm. Backfill and compact soil into the trench, | #Secure blanket into the trench with staples every 300 mm. Backfill and compact soil into the trench, |
Latest revision as of 15:13, 19 October 2018
Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events. Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary erosion control blanket). Mats should be applied with soil fill technique:
- Grade the swale and smooth the top soil, removing any debris and large rocks,
- Seed with turf grass mixture,
- Dig 150 mm anchor trench at the top of the channel,
- Secure blanket into the trench with staples every 300 mm. Backfill and compact soil into the trench,
- Unroll mat in the direction of flow. Staple as recommended by manufacturer,
- Overlaps should be 150 mm and stapled. Upstream mat should always overlay the downstream mat,
- Anchor the bottom end of the channel in a similar fashion to the top,
- Apply 15-20 mm of topsoil over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil,
- An erosion control blanket may be applied to protect the surface through the first one or two years,
- Irrigate until turf grass is established.