Difference between revisions of "Protecting LID features during construction: Gallery"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
<gallery mode="packed" widths=300px heights=200px>
+
<gallery mode="packed" heights=300px>
|Keep LID perimeter controls in working order throughout construction.  
+
ESC premature removal.jpg|Keep LID perimeter controls in working order throughout construction. ESC measures at this bioretention feature were removed before construction in its drainage was complete, allowing sediment into it (Photo Source: CVC).
 
Screenshot 2025-11-12 114624.png|Protect LID inlets.
 
Screenshot 2025-11-12 114624.png|Protect LID inlets.
 
Screenshot 2025-11-12 114809.png|Avoid heavy equipment on infiltration areas (i.e., driving vehicles through filter beds, or over granular water storage and bedding layers). Identify and mark LID areas to increase awareness.
 
Screenshot 2025-11-12 114809.png|Avoid heavy equipment on infiltration areas (i.e., driving vehicles through filter beds, or over granular water storage and bedding layers). Identify and mark LID areas to increase awareness.

Latest revision as of 19:31, 12 November 2025