Difference between revisions of "Bioretention: Construction checklist"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) (Created page with "Common construction pitfalls can be avoided with careful construction supervision that focuses on the following aspects: <table table class = wikitable> <tr><th colspan =2>Ero...") |
|||
(27 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
Common construction pitfalls can be avoided with careful construction supervision that focuses on the following aspects: | Common construction pitfalls can be avoided with careful construction supervision that focuses on the following aspects: | ||
− | + | {| class="wikitable" | |
− | + | |- | |
− | + | !colspan =2|Erosion and Sediment Control | |
− | + | |- | |
− | + | |style="width:30px"| | |
− | Materials | + | |Bioretention locations should be blocked from construction traffic and should not be used for erosion and sediment control |
− | + | |- | |
− | + | || | |
− | + | |Proper erosion and sediment controls should be in place for the drainage area | |
− | + | |- | |
− | + | !colspan =2|Materials | |
+ | |- | ||
+ | |style="width:30px"| | ||
+ | |Gravel for the underdrain should be clean and washed; no fines should be present in the material | ||
+ | |- | ||
+ | || | ||
+ | |Underdrain pipe material should be perforated and of the correct size (when specified in design) | ||
+ | |- | ||
+ | || | ||
+ | |A cap should be placed on the upstream (but not the downstream) end of the underdrain (when specified in design) | ||
+ | |- | ||
+ | || | ||
+ | |Biomedia should be tested to confirm that it meets specifications | ||
+ | |- | ||
+ | || | ||
+ | |Mulch composition should be correct | ||
+ | |- | ||
+ | !colspan =2|Elevations | ||
+ | |- | ||
+ | |style="width:30px"| | ||
+ | |Depth of the gravel and invert of the underdrain | ||
+ | |- | ||
+ | || | ||
+ | |Inverts for inflow and outflow points | ||
+ | |- | ||
+ | || | ||
+ | |Filter media depth | ||
+ | |- | ||
+ | || | ||
+ | |Ponding depth provided between the surface of the filter bed and the overflow structure | ||
+ | |- | ||
+ | || | ||
+ | |Mulch depth | ||
+ | |- | ||
+ | !colspan =2|Landscaping and Stabilization | ||
+ | |- | ||
+ | |style="width:30px"| | ||
+ | |Correct vegetation should be planted | ||
+ | |- | ||
+ | || | ||
+ | |Pretreatment area should be stabilized | ||
+ | |- | ||
+ | || | ||
+ | |Drainage area should be stabilized prior to directing water to the bioretention | ||
+ | |- | ||
+ | !colspan =2|The following items should be checked after the first rainfall event, and adjustments should be made as necessary: | ||
+ | |- | ||
+ | |style="width:30px"| | ||
+ | |Outfall protection/energy dissipation at concentrated inflow should be stable | ||
+ | |- | ||
+ | || | ||
+ | |Flow should not concentrate and should spread evenly over the filter bed | ||
+ | |- | ||
+ | || | ||
+ | |Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event. <br> The biomedia should fully drain within a maximum period of 72 hours | ||
+ | |- | ||
+ | || | ||
+ | |Excessive sediment accumulation should not be present | ||
+ | |} | ||
− | + | [[category:Checklists]] | |
− | + | [[category:Construction]] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− |
Latest revision as of 14:59, 5 July 2022
Common construction pitfalls can be avoided with careful construction supervision that focuses on the following aspects:
Erosion and Sediment Control | |
---|---|
Bioretention locations should be blocked from construction traffic and should not be used for erosion and sediment control | |
Proper erosion and sediment controls should be in place for the drainage area | |
Materials | |
Gravel for the underdrain should be clean and washed; no fines should be present in the material | |
Underdrain pipe material should be perforated and of the correct size (when specified in design) | |
A cap should be placed on the upstream (but not the downstream) end of the underdrain (when specified in design) | |
Biomedia should be tested to confirm that it meets specifications | |
Mulch composition should be correct | |
Elevations | |
Depth of the gravel and invert of the underdrain | |
Inverts for inflow and outflow points | |
Filter media depth | |
Ponding depth provided between the surface of the filter bed and the overflow structure | |
Mulch depth | |
Landscaping and Stabilization | |
Correct vegetation should be planted | |
Pretreatment area should be stabilized | |
Drainage area should be stabilized prior to directing water to the bioretention | |
The following items should be checked after the first rainfall event, and adjustments should be made as necessary: | |
Outfall protection/energy dissipation at concentrated inflow should be stable | |
Flow should not concentrate and should spread evenly over the filter bed | |
Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event. The biomedia should fully drain within a maximum period of 72 hours | |
Excessive sediment accumulation should not be present |