Line 58:
Line 58:
*Erosion protection such as river stone or riprap will be required to dissipate the energy from incoming concentrated flow.
*Erosion protection such as river stone or riprap will be required to dissipate the energy from incoming concentrated flow.
*The channel must be vegetated immediately after grading. Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation.
*The channel must be vegetated immediately after grading. Preferably, the swale should be planted in the spring so that the vegetation can become established with minimal irrigation.
+
+
----