The following, comprehensive list is presented as a basis for discussion between regulatory authorities and design practitioners.
+
{{TOClimit|2}}
==Site Description==
==Site Description==
* Location (key plan, municipal address, nearest roads, watershed and subwatershed);
* Location (key plan, municipal address, nearest roads, watershed and subwatershed);
Line 9:
Line 11:
==Background Information==
==Background Information==
* Pre-submission meeting verification;
* Pre-submission meeting verification;
−
* Reports from pre-consultation with MOECC and other agencies (especially related LID credits);
+
* Reports from pre-consultation with MOECP and other agencies (especially related LID credits);
* Watershed plans;
* Watershed plans;
* Sub-Watershed plans;
* Sub-Watershed plans;
Line 19:
Line 21:
==Figures and drawings==
==Figures and drawings==
* Location plan in the report;
* Location plan in the report;
−
* Key Plan on the drawings;
+
* Key plan on the drawings;
* All watercourses and names of watercourses shown on all figures and drawings;
* All watercourses and names of watercourses shown on all figures and drawings;
* Pre-development and post-development drainage plans for hydrologic model(s) which include:
* Pre-development and post-development drainage plans for hydrologic model(s) which include:
Line 29:
Line 31:
**100 year capture;
**100 year capture;
**Site outlets; and
**Site outlets; and
−
**SWM facility location and associated tributary areas;
+
**LID facility location and associated tributary areas;
* Model schematics;
* Model schematics;
−
* Storm drainage, grading and general servicing plans;
+
* Storm drainage, [[grading]] and general servicing plans;
−
* SWM facility design drawings and details;
+
* LID practice design [[drawings]] and details;
−
* Erosion and sediment control plans;
+
* [https://sustainabletechnologies.ca/home/erosion-and-sediment-control/ Erosion and sediment control plans];
+
{| class="wikitable sortable"
+
! Parameter
+
! Plan
+
! Detail
+
! Profile
+
! Description
+
|-
+
| Location
+
| x
+
|
+
|
+
| Area extent shown on plan view (bump-outs, municipal reserves, private lots, parks)
+
|-
+
| Surface area
+
| x
+
|
+
|
+
| Outlined on plan view drawings and stated in report
+
|-
+
| Inlet
+
| x
+
| x
+
|
+
| shown on plan view and typical details provided ([[curb cuts]], [[level spreader|flow spreader]], ribbon curb)
+
|-
+
| Materials
+
|
+
| x
+
|
+
| Materials specs (soil, drainage layer), depth, hydraulic conductivity, porosity
+
|-
+
| Vegetation
+
| x
+
| x
+
|
+
| Planting plan and [[vegetation]] details (species, mature density, succession plan)
+
|-
+
| Outlet
+
| x
+
| x
+
| x
+
| [[Underdrain]] spec and slope, spill elevation, catch basin type and grate, [[weir]] type and location, [[inlet]] control device details
+
|-
+
| Catchment
+
| x
+
|
+
|
+
| Delineated catchment area directed to [[bioretention]] facility
+
|-
+
| Subsurface materials
+
|
+
| x
+
|
+
| Layer order (filter, [[reservoir aggregate|reservoir]], [[choker course]], [[geotextiles]] (if using)) and specifications (gradation, hydraulic conductivity, void space)
+
|-
+
| Depth
+
|
+
| x
+
| x
+
| Depth of each layer, reservoir retention depth (if applicable), surface ponding depth (if applicable)
+
|-
+
| Slope
+
|
+
| x
+
| x
+
| Sub-base slope and surface slope
+
|-
+
| Flow Arrows
+
|
+
| x
+
|
+
| From contributing area and overflow route
+
|-
+
| Water depth
+
|
+
| x
+
|
+
| Ponding depth and water surface elevation during design storm and maximum prior to [[overflow]]
+
|-
+
| Inundation
+
|
+
| x
+
|
+
| Extent of of inundation during design storms
+
|-
+
| Erosion control
+
| x
+
| x
+
|
+
| Located at inlet, outlet if overland spill
+
|}
+
==Design Information==
+
* Consistent hydrology modelling to be utilized for each development application and/or consistent with MESP/MSP/Studies.
+
* Supporting information has been included for all modelling parameters and calculations.
+
*Stage-Storage-Discharge calculations provided for each LID facility including design information on control and emergency overflow weirs.
+
*Flow and storage summary tables provided which reference the associated drainage area, catchment ID, outlet(s) and differentiate between controlled and uncontrolled areas.
+
*Identify and show seasonal high groundwater levels in report and on drawings;
+
*Per [https://www.ontario.ca/document/stormwater-management-planning-and-design-manual-0 MOECC SWM manual, 2003] (i.e. Drainage area, required volume, slopes, forebay, etc.);
+
*The SWM report and drawings are to include a table summarizing required storage, provided storage and associated elevation and flow for the permanent pool, 25mm (extended detention), and 2 through 100 year return period storm events where applicable for each facility;
+
*An operations and maintenance manual (includings a maintenance schedule) should be included in the SWM Report for all LID facilities in accordance with municipal requirements;
+
*Complete information on proposed manufactured treatment devices is to be provided including current status under [[Pretreatment#Concentrated underground flow|ETV protocols]];
+
===Quantity control===
+
*Runoff coefficient or imperviousness calculations;
+
*Analysis using appropriate storm distributions;
+
*Pre-development peak flow (m³/s);
+
*Post-development uncontrolled peak flow (m³/s);
+
*Post-development controlled peak flow (m³/s);
+
*LID Facility Type;
+
*Stage – Storage – Discharge Table;
+
*Outlet design and calculations;
+
*Total storage required (m<sup>3</sup>);
+
*Total storage provided (m<sup>3</sup>);
+
*Table comparing provided versus required;
+
*Overland flow conveyance and design;
+
*External drainage conveyance (100 year and Regional);
+
===Quality control===
+
*Level of protection;
+
*Drainage area to facility in hectares;
+
*Percentage impervious – total and directly connected areas;
+
*SWM facility monitoring and maintenance requirements;
+
+
==Hazard land management==
+
*Regional event and 1:100 year flood lines under existing and proposed conditions shown on appropriate plan drawings;
+
*Valley top of bank, stream erosion, steep slope allowances and meanderbelt assessed (confined stream systems only);
+
*Wetlands and required setbacks determined and identified on plans;
+
*Meanderbelt assessment and/or setback determined and identified on plans;
+
*Wave uprush and/or wind setup elevations calculated;
+
*“Limit of development” shown on plans;
+
*Survey and floodplain mapping submitted (see below);
+
*Hydraulic modelling and analysis including digital files;
+
==Other==
+
*Upon approval of the SWM design, a digital copy of the stormwater drainage plan is to be submitted including the location and size of the SWM facility in GIS format;
+
----
===Floodplain mapping and documentation minimum requirements===
===Floodplain mapping and documentation minimum requirements===
# Hydraulic sections with regulated floodplain elevations and cross-section identification;
# Hydraulic sections with regulated floodplain elevations and cross-section identification;
Line 47:
Line 182:
# Natural features such as watercourses and wetlands;
# Natural features such as watercourses and wetlands;
# Floodplain mapping and supporting documentation signed and stamped by a P.Eng.
# Floodplain mapping and supporting documentation signed and stamped by a P.Eng.
−
==Survey Documentation Minimum Requirements==
+
===Survey documentation minimum requirements===
For any submission which contains drawings or figures that present survey information, the following list of minimum requirements must be included:
For any submission which contains drawings or figures that present survey information, the following list of minimum requirements must be included:
# Document with text descriptor identifying overall approach and methodology;
# Document with text descriptor identifying overall approach and methodology;
Line 64:
Line 199:
# Digital copy of the survey data when applicable; and
# Digital copy of the survey data when applicable; and
# Submission components to be stamped and signed by an OLS, P.Eng. or C.E.T. as relevant.
# Submission components to be stamped and signed by an OLS, P.Eng. or C.E.T. as relevant.
−
==Geospatial Data Submission Minimum Requirements==
+
+
===Geospatial data submission minimum requirements===
For a submission which contain drawings, figures, reports, modelling and / or memos that present geospatial information and its analysis; the following list of minimum requirements must be included:
For a submission which contain drawings, figures, reports, modelling and / or memos that present geospatial information and its analysis; the following list of minimum requirements must be included:
# Text summary identifying methodology and software used in geospatial analysis;
# Text summary identifying methodology and software used in geospatial analysis;