| !Bioswales | | !Bioswales |
Line 132: |
Line 129: |
| | | | | |
| | | | | |
− | |
| |
− | |
| |
− | |-
| |
| |- | | |- |
| !Perforated Pipe | | !Perforated Pipe |
Line 150: |
Line 144: |
| | | | | |
| | | | | |
− | |
| |
− | |
| |
− | |-
| |
| |- | | |- |
| !Green Roofs | | !Green Roofs |
Line 168: |
Line 159: |
| | | | | |
| | | | | |
− | |
| |
− | |Load bearing capacity of the building structure and selected roof deck need to be sufficient to support the weight of the soil, vegetation and accumulated water or snow, and may also need to support pedestrians, concrete pavers, etc.
| |
− | |-
| |
| |- | | |- |
| !Rainwater Harvesting | | !Rainwater Harvesting |
Line 185: |
Line 173: |
| | | | | |
| | | | | |
− | |
| |
− | |Underground cisterns should be placed in areas without vehicular traffic. Tanks under roadways, parking lots, or driveways must be designed for the live loads from heavy trucks, a requirement that could significantly increase construction costs.
| |
| | | | | |
| |} | | |} |