Changes

Jump to navigation Jump to search
m
no edit summary
Line 86: Line 86:  
This pilot credit requires whole building  water use modeling to demonstrate reduced water use compared to a baseline model.
 
This pilot credit requires whole building  water use modeling to demonstrate reduced water use compared to a baseline model.
 
A sliding scale awards between 1 point for 10% reduction to 10 points for 65% reduction.  
 
A sliding scale awards between 1 point for 10% reduction to 10 points for 65% reduction.  
Making this kind of water use reduction would typically require reuse of [[greywater]] as well as an optimized RWH plan.
+
Making this kind of water use reduction would typically require reuse of greywater as well as an optimized RWH plan.
 
==See Also==
 
==See Also==
 
*[[Rain Barrels|Rain Barrels]]
 
*[[Rain Barrels|Rain Barrels]]
8,255

edits

Navigation menu