Changes

Jump to navigation Jump to search
m
Line 15: Line 15:  
Sediment loading rates from impervious surfaces studied by STEP were between 0.3 - 0.6 m³/ha/yr <ref>Goncalves, C., & Van Seters, T. (2012). Characterization of Particle Size Distributions of Runoff from High Impervious Urban Catchments in the Greater Toronto Area. Retrieved from https://sustainabletechnologies.ca/app/uploads/2013/03/PSD-2012-final.pdf</ref>. In Brisbane a value of 0.6 m³/ha/yr is the default value used to size small forebays <refname = HW>Healthy Waterways Ltd. (2014). Bioretention Technical Design Guidelines. Retrieved from https://hlw.org.au/u/lib/mob/20150715140823_de4e60ebc5526e263/wbd_2014_bioretentiontdg_mq_online.pdf</ref>.  
 
Sediment loading rates from impervious surfaces studied by STEP were between 0.3 - 0.6 m³/ha/yr <ref>Goncalves, C., & Van Seters, T. (2012). Characterization of Particle Size Distributions of Runoff from High Impervious Urban Catchments in the Greater Toronto Area. Retrieved from https://sustainabletechnologies.ca/app/uploads/2013/03/PSD-2012-final.pdf</ref>. In Brisbane a value of 0.6 m³/ha/yr is the default value used to size small forebays <refname = HW>Healthy Waterways Ltd. (2014). Bioretention Technical Design Guidelines. Retrieved from https://hlw.org.au/u/lib/mob/20150715140823_de4e60ebc5526e263/wbd_2014_bioretentiontdg_mq_online.pdf</ref>.  
   −
2. The area of the forebay (''A<sub>f</sub>'') designed for 80 % capture efficiency (i.e. R = 0.8) may be estimated</refname = HW> as:
+
2. The area of the forebay (''A<sub>f</sub>'') designed for 80 % capture efficiency (i.e. R = 0.8) may be estimated<\refname = HW> as:
:<math>A_{f}=120\times Q}</math>
+
 
 +
:<math>A_{f}=120\times Q</math>
    
{{plainlist| 1=Where:
 
{{plainlist| 1=Where:
8,255

edits

Navigation menu