Changes

Jump to navigation Jump to search
m
no edit summary
Line 10: Line 10:  
*''R'' = The capture efficiency (suggest 0.8),
 
*''R'' = The capture efficiency (suggest 0.8),
 
*''L<sub>o</sub>'' = The sediment loading rate (m³/Ha/yr), and
 
*''L<sub>o</sub>'' = The sediment loading rate (m³/Ha/yr), and
*''F<sub>c</sub> = The cleanout frequency (yrs)   
+
*''F<sub>c</sub>'' = The cleanout frequency (yrs)   
 
}}
 
}}
   Line 18: Line 18:  
{{plainlist| 1=Where:
 
{{plainlist| 1=Where:
 
*''Q'' = Design flow rate (m³/s)
 
*''Q'' = Design flow rate (m³/s)
*''V<sub>f</sub> = Volume of forebay (m³).}}
+
*''V<sub>f</sub>'' = Volume of forebay (m³).}}
    +
Check that the forebay depth (d<sub>f</sub>) ≤ 0.3 m:
 +
: <math>d_{f}=\frac{V_{f}}{A_{f}}
     
8,255

edits

Navigation menu