Changes

Jump to navigation Jump to search
m
Line 60: Line 60:  
*''P'' is the perimeter of the practice (m), and
 
*''P'' is the perimeter of the practice (m), and
 
*''d'' is the total depth of the practice, including the ponding zone (m).}}
 
*''d'' is the total depth of the practice, including the ponding zone (m).}}
  −
To calculate the time (''t'') to fully drain the facility:
  −
:<math>t=\frac{V_{R}A_{p}} {q'P}ln\left [ \frac{\left (d+ \frac{A_{p}}{P} \right )}{\left(\frac{A_{p}}{P}\right)}\right]</math>
      
This 3 dimensional equation makes use of the hydraulic radius (''A<sub>p</sub>''/''P''), where ''P'' is the perimeter (m) of the facility. <br>
 
This 3 dimensional equation makes use of the hydraulic radius (''A<sub>p</sub>''/''P''), where ''P'' is the perimeter (m) of the facility. <br>
8,255

edits

Navigation menu