Changes

Jump to navigation Jump to search
m
Line 18: Line 18:     
==Planning considerations==
 
==Planning considerations==
 +
When planning a new site, all swales and overground flow paths should be fitted perpendicular to existing contours. See [[Natural drainage]] and [[Existing hydrology]].
 +
 
===Best cross sections===
 
===Best cross sections===
 
[[File:Best X-section.png|thumb|Both sections a)triangular and, b)trapezoidal, are constrained within ratios of 8:1 H:V]]  
 
[[File:Best X-section.png|thumb|Both sections a)triangular and, b)trapezoidal, are constrained within ratios of 8:1 H:V]]  
8,255

edits

Navigation menu