Changes

Jump to navigation Jump to search
m
Line 59: Line 59:  
===Sizing and Modeling===
 
===Sizing and Modeling===
 
Bioretention facilities should be sized to accommodate runoff from approximately 5 to 20 times the footprint area of the facility. i.e. I/P ratio of 5 to 20.  
 
Bioretention facilities should be sized to accommodate runoff from approximately 5 to 20 times the footprint area of the facility. i.e. I/P ratio of 5 to 20.  
   
'''[[Bioretention: Sizing| Sizing]]'''
 
'''[[Bioretention: Sizing| Sizing]]'''
   
'''[[Bioretention: TTT| Modeling]]'''
 
'''[[Bioretention: TTT| Modeling]]'''
  −
===Submissions===
  −
{{:Bioretention: Drawings}}
      
===Plant Selection===
 
===Plant Selection===
Line 83: Line 78:     
Tables for identifying ideal species for bioretention are found [[Bioretention: Plant lists|here]]. See [[Plant standards|plant standards]] for specific plant species and sizes.
 
Tables for identifying ideal species for bioretention are found [[Bioretention: Plant lists|here]]. See [[Plant standards|plant standards]] for specific plant species and sizes.
 +
 
==Construction==
 
==Construction==
 
{{:Bioretention: Construction}}
 
{{:Bioretention: Construction}}
8,255

edits

Navigation menu