Changes

Jump to navigation Jump to search
m
no edit summary
Line 32: Line 32:  
|Offset height||This is the height from the base of the cell to the height at which the drain discharges. In some designs this may be the height of the perforated pipe within the storage layer. In other designs this height is adjusted by creating an upturn in the discharge pipe.  
 
|Offset height||This is the height from the base of the cell to the height at which the drain discharges. In some designs this may be the height of the perforated pipe within the storage layer. In other designs this height is adjusted by creating an upturn in the discharge pipe.  
 
|}
 
|}
[[category: modeling]]
+
[[category: modelling]]
8,255

edits

Navigation menu