Difference between revisions of "Filter strips: TTT"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) m |
Jenny Hill (talk | contribs) m |
||
Line 29: | Line 29: | ||
|Design drawdown time (hrs)||? | |Design drawdown time (hrs)||? | ||
|} | |} | ||
− | [[category: | + | [[category:modelling]] |
Revision as of 21:55, 8 March 2018
Surface | |
---|---|
Berm height (mm) | This is the height of the curb which constrains the overland sheet flow of water. Where the bottom of the slope discharges directly into another LID facility without impedance, the value is 0. |
Surface roughness (Manning’s n) | Lower numbers indicate less surface obstruction and result in faster flow. See Turf |
Surface slope (%) | If the slope > 3%, consider using level spreaders to reduce erosion of the surface under high flow velocities. |
Soil (native underlying soil, or amended topsoil) | |
Thickness (mm) | If topsoil has been amended Absorbent landscapes |
Porosity (fraction) | Suggest range 0.35 – 0.4, unless otherwise tested |
Field capacity (fraction) | Will vary according to native or amended topsoil[1] |
Wilting point (fraction) | |
Conductivity (mm/hr) | |
Conductivity slope | |
Suction head (mm) | |
Design drawdown time (hrs) | ? |
- ↑ Oregon State Univ., Corvallis. Dept. of Civil, Construction and Environmental Engineering.; Environmental Protection Agency, Cincinnati ONRMRL. Storm Water Management Model Reference Manual Volume I Hydrology (Revised). 2016:233. https://nepis.epa.gov/Exe/ZyPURL.cgi?Dockey=P100NYRA.txt Accessed August 23, 2017.