Changes

Jump to navigation Jump to search
m
Line 39: Line 39:  
* Consistent hydrology modelling to be utilized for each development application and/or consistent with MESP/MSP/Studies.
 
* Consistent hydrology modelling to be utilized for each development application and/or consistent with MESP/MSP/Studies.
 
* Supporting information has been included for all modelling parameters and calculations.
 
* Supporting information has been included for all modelling parameters and calculations.
*Stage-Storage-Discharge calculations provided for each SWM facility including design information on control and emergency overflow weirs.
+
*Stage-Storage-Discharge calculations provided for each LID facility including design information on control and emergency overflow weirs.
 
*Flow and storage summary tables provided which reference the associated drainage area, catchment ID, outlet(s) and differentiate between controlled and uncontrolled areas.
 
*Flow and storage summary tables provided which reference the associated drainage area, catchment ID, outlet(s) and differentiate between controlled and uncontrolled areas.
 
*Identify and show seasonal high groundwater levels in report and on drawings;
 
*Identify and show seasonal high groundwater levels in report and on drawings;
8,255

edits

Navigation menu