*The SWM report and drawings are to include a table summarizing required storage, provided storage and associated elevation and flow for the permanent pool, 25mm (extended detention), and 2 through 100 year return period storm events where applicable for each facility;
 
*The SWM report and drawings are to include a table summarizing required storage, provided storage and associated elevation and flow for the permanent pool, 25mm (extended detention), and 2 through 100 year return period storm events where applicable for each facility;
 
*An operations and maintenance manual (includings a maintenance schedule) should be included in the SWM Report for all LID facilities in accordance with municipal requirements;
 
*An operations and maintenance manual (includings a maintenance schedule) should be included in the SWM Report for all LID facilities in accordance with municipal requirements;
*Complete information on proposed manufactured treatment devices is to be provided including current status under ETV protocols;
+
*Complete information on proposed manufactured treatment devices is to be provided including current status under [[Pretreatment#Concentrated underground flow|ETV protocols]];
 
===Quantity control===
 
===Quantity control===
 
*Runoff coefficient or imperviousness calculations;
 
*Runoff coefficient or imperviousness calculations;