==Calculate the maximum overall depth==
 
==Calculate the maximum overall depth==
*Step 1: Determine what the planting needs are and assign appropriate depth of media.  
+
*Step 1: Determine what the planting needs are and assign appropriate depth of media, using the table above.  
*Step 2: Decide on the underdrain pipe diameter.  
+
*Step 2: Select an underdrain pipe diameter (typically 100 - 200 mm), assign this as an 'embedding' depth.
*Step 3: Determine maximum possible storage reservoir depth beneath the pipe (''d<sub>s</sub>''):
+
*Step 3: Calculate the maximum possible storage reservoir depth beneath the pipe (''d<sub>s</sub>''):
 
<math>d_{s}=f'\times38.4</math>
 
<math>d_{s}=f'\times38.4</math>
 
{{Plainlist|1=Where:
 
{{Plainlist|1=Where:
Line 57: Line 57:  
*''f''' = Design infiltration rate in mm/hr, and
 
*''f''' = Design infiltration rate in mm/hr, and
 
*19.2 comes from multiplying desired drainage time of 48 hours by void ratio of 0.4. Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.}}
 
*19.2 comes from multiplying desired drainage time of 48 hours by void ratio of 0.4. Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.}}
* Step 5: Sum total depth of bioretention and compare to available space above water table and bedrock. Adjust if necessary.
+
* Step 5: Sum total depth of bioretention, and compare to available space above water table and bedrock. Adjust if necessary.
    