Changes

Jump to navigation Jump to search
m
Line 19: Line 19:  
# Place 5 cm of clean fine gravel in the bottom of the hole. If the sidewalls are likely to collapse, use a paper basket to support the sidewalls.  
 
# Place 5 cm of clean fine gravel in the bottom of the hole. If the sidewalls are likely to collapse, use a paper basket to support the sidewalls.  
 
#Place a piece of white plastic or similar provided with clear marks at 12.5 and 15 cm (5" and 6") from the bottom of the test hole prior to adding the gravel. For greater accuracy a float and pointer arrangement can be set up.
 
#Place a piece of white plastic or similar provided with clear marks at 12.5 and 15 cm (5" and 6") from the bottom of the test hole prior to adding the gravel. For greater accuracy a float and pointer arrangement can be set up.
# If the soil contains considerable amounts of silt or clay, and certainly for any soil with “clay” as part of the texture description, the test holes should be pre-soaked before proceeding with the
+
# If the soil contains considerable amounts of silt or clay, and certainly for any soil with “clay” as part of the texture description, the test holes should be pre-soaked before proceeding with the test. Pre-soaking is accomplished by keeping the hole filled with water for 4 hours or more. The water should be added carefully and slowly to avoid disturbing the soil (including the sidewall soils). The test should be carried out immediately after pre-soaking;
test. Pre-soaking is accomplished by keeping the hole filled with water for 4 hours or more. The water should be added carefully and slowly to avoid disturbing the soil (including the sidewall soils). The test should be carried out immediately after pre-soaking;
      
==Making measurements===
 
==Making measurements===
8,255

edits

Navigation menu