Changes

Jump to navigation Jump to search
m
Line 82: Line 82:     
Large-scale projects require significantly more effort, budget, and staff than small-scale projects. Large-scale LID practices include:
 
Large-scale projects require significantly more effort, budget, and staff than small-scale projects. Large-scale LID practices include:
* Bioretention
+
* [[Bioretention]]
* Enhanced grass swales
+
* [[Enhanced grass swales]]
* Bioswales
+
* [[Bioswales]]
 
* Perforated pipe systems
 
* Perforated pipe systems
* Permeable pavement
+
* [[Permeable paving|Permeable pavement]]
* Soakaways
+
* [[Soakaways, Infiltration Trenches and Infiltration Chambers Guide|Soakaways]]
* Infiltration chambers
+
* [[Infiltration chambers]]
* Rainwater harvesting  
+
* [[Rainwater harvesting]]
 
* Prefabricated modules
 
* Prefabricated modules
  
390

edits

Navigation menu