Understanding site conditions is critical when [[Screening LID Options]]. Gaining comprehensive knowledge of the proposed site requires a desktop review of relevant background information followed by field reconnaissance to verify the review and identify site conditions not included in background information.   
 
Understanding site conditions is critical when [[Screening LID Options]]. Gaining comprehensive knowledge of the proposed site requires a desktop review of relevant background information followed by field reconnaissance to verify the review and identify site conditions not included in background information.   
 
== Desktop Analysis of Background Information ==
 
== Desktop Analysis of Background Information ==
Line 5: Line 4:
  
 
Relevant background information may include:
 
Relevant background information may include:
 
 
* Construction drawings from site and adjacent properties
 
* Construction drawings from site and adjacent properties
 
* Mechanical drawings identifying rain leader piping
 
* Mechanical drawings identifying rain leader piping
Line 27: Line 25:
 
* Neighbouring landscapes
 
* Neighbouring landscapes
 
* Landowner/company vision and priorities
 
* Landowner/company vision and priorities
 
 
== Field Reconnaissance of Site Conditions ==
 
== Field Reconnaissance of Site Conditions ==
 
When documenting side conditions for commercial, industrial, and multi-residential sites, investigate the following:
 
When documenting side conditions for commercial, industrial, and multi-residential sites, investigate the following:
 
 
* Drainage and grade
 
* Drainage and grade
 
* Roof tops
 
* Roof tops

Revision as of 19:36, 1 December 2017

Understanding site conditions is critical when Screening LID Options. Gaining comprehensive knowledge of the proposed site requires a desktop review of relevant background information followed by field reconnaissance to verify the review and identify site conditions not included in background information.

Desktop Analysis of Background Information

In general, background information will help provide preliminary understanding of side conditions, scope technical investigations for the site and determine project targets. It’s best to collect and review this information prior to field reconnaissance so that it is targeted and efficient use of time.

Relevant background information may include:

  • Construction drawings from site and adjacent properties
  • Mechanical drawings identifying rain leader piping
  • Structural reports and plans (to assess greenroof suitability)
  • Servicing drawings (hydro, phone, gas, cable, and other utilities)
  • Grading plans
  • Stormwater management and drainage reports
  • Sump-pump and/or foundation drain connection information
  • Local stormwater management criteria
  • Hydrologic models
  • Hydraulic models
  • Aerial photos
  • Surveys
  • Local Digital Elevation Model (DEM)
  • Surficial soils and geology data
  • Geotechnical investigations and reports
  • Relevant local policies, by-laws and standards
  • Snow plow/salting operations
  • Snow storage
  • Smoking areas
  • Neighbouring landscapes
  • Landowner/company vision and priorities

Field Reconnaissance of Site Conditions

When documenting side conditions for commercial, industrial, and multi-residential sites, investigate the following:

  • Drainage and grade
  • Roof tops
  • Parking Lots
    • Parking lot islands
    • Landscaping
    • Parking availability and access
    • Access, traffic, and pedestrian safety
  • Building location
  • Pollutions sources and opportunities for pollution prevention
  • Underground utilities
  • Accommodation of surface elements (such as light standards, storage areas or other items)
  • Transportation requirements
  • Site aesthetics
  • Shipping and receiving requirements
  • Spill containment plans
  • Operations and maintenance capabilities
  • Municipal engineering standards
  • Traffic safety issues
  • Pedestrian safety and accessibility
  • Snow removal and fire access requirements (minimum access road width and turning radius requirements)
  • General impressions

This list is not meant to be exhaustive - keep your eyes open for other relevant factors, and let us know if there's anything we should add.

Once the analysis is complete, proceed to developing a list of recommended BMPs for implementation.